UNAMID Mission Headquarters

Our largest project — an integrated compound for the joint UN mission in Darfur

$100MProject value
DarfurLocation
UNAMIDClient — UN Mission
Completed ✓Status
About the Project

A complete town in the heart of Darfur

The headquarters compound of the joint UN–African Union mission (UNAMID) — hundreds of residential and administrative units with internal roads and full infrastructure, delivered to strict UN specifications and non-negotiable schedules.

At over $100 million, this project is the strongest practical proof of our capability: an international body with the world's toughest audit standards chose us — and accepted our handover — in one of the hardest logistical environments anywhere.

Scope of Works

  • Hundreds of residential and administrative units — turnkey
  • Internal roads, grading and full infrastructure
  • Power, water and drainage networks for the compound
  • Perimeter walls, gates and UN security requirements
  • Fully self-reliant logistics at a remote site
Project Gallery

From the ground

THE CHALLENGE

The Challenge

Building a UN-spec compound at a remote Darfur site: no existing infrastructure, supply lines stretching hundreds of kilometers, schedules governed by Security Council resolutions with zero flexibility, and international quality audits on every item.

OUR SOLUTION

The Solution

A fully self-contained production camp on site: local concrete batching, a supply chain run on scheduled convoys, and our wholly owned fleet eliminating third-party dependence — with a quality documentation system matching international requirements item by item.

Execution Phases

From contract to handover

PHASE 01

Contract & mobilization

Contract signature, moving equipment and crews, building the self-reliant work camp.

PHASE 02

Earthworks & infrastructure

Site grading, internal roads, and water, drainage and power networks.

PHASE 03

Unit construction

Residential and administrative units built in parallel on multiple fronts to compress the schedule.

PHASE 04

Finishes & systems

Complete finishing, MEP installation and UN security requirements.

PHASE 05

International acceptance

Inspections and acceptance per UN protocols, with documented final handover.

Project Files

Documents to download

Related Projects

From the same portfolio

A project of this scale? That's our specialty

If the United Nations accepted our handover, your project is in safe hands. Let's talk.

Request a Quote